This project in Greece is composed of three blocks connected to each other by a central corridor and with a total area of 5 Ha. Each block has a structure to support hanging hydroponic channels, as well as a thermal screen, water heating, irrigation, and cooling system.
For more information:
Inverca
inverca@inverca.es
www.inverca.es